The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
Sheetrocking a concrete wall.
Here are some tips to.
Tap a sleeve into each hole with a hammer.
Measure the wall stud height in three or four spots and cut the studs to the shortest dimension using a portable circular saw.
As email protected says fir out studs with 1x2 s when you get to the concrete tapcon them to the wall then put 3 4 foam between the 1x2 s on concrete sheetrock as usual no mr board needed.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make sure you ve spaced the hat channels properly for the size of drywall and insulation you re using.
By damon koch you can glue drywall sheets to a concrete block wall.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
This translates into a cost of 0 40 to 0 65 per square foot.
Assemble the wall frame.
However in some installations such as in a basement it is necessary to glue drywall sheets to the interior of concrete block walls.
Drywall is usually attached to wall studs with 2 inch drywall screws using an electric drill with a driver bit installed.
Space the screws 12 to.
Drill a 1 1 2 inch deep hole in the wall on each pencil mark with a hammer drill and a masonry bit that is the same dimeter as a metal screw anchor sleeve.
For walls and ceiling for a 200 square foot room you can expect to pay 300 to 500.
Assemble the wall frame on the floor by placing the studs between the top and bottom plates.
One common technique is to cover the block wall with drywall.
Align each stud with the 16 inch on center marks made earlier.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Want the block wall in your basement to have a more finished appearance.